
Phase Planner
List the features you want, tap a phase number for each, set what feels comfortable to spend in one phase and see the spend per phase, a rough timeline and a warning if the order of work does not make sense.
Stage It: Phase Planner
- Phase one-
- Phase two-
- Phase three-
- Rough timeline-
Saved. It travels with the form at the bottom of this page.
Points are relative, not dollars: 1 is a small job and 20 is a major one such as a pool. Your written scope has the real numbers. The order check flags work that depends on earlier work.
What the numbers mean
- Three phasesSpread the work over time.
- Spend per phaseCompared with your comfort level.
- An order checkBase before kitchen, kitchen before roof.
About this tool
Are points dollars?
No. Points are relative, with 1 a small job and 20 a major one. Your written scope has real prices.
Which things have to come first?
Grading and drainage, the patio base and utilities usually come first, and roofs and pools often come later.
Can I send what I picked?
Yes. It goes to the form with the press of a button.
When the numbers say it is time
PlanningBudget and Phase PlanningPlan the whole backyard, then build it in phases that fit your budget, with the base, utilities and edges set up for what comes next.See the details
PlanningOutdoor Living Master PlanningOne plan for the whole yard, with zones for dining, fire, water, play and garden, so every piece fits and nothing has to be torn out later.See the details
PatiosCustom PatiosA patio designed around your yard, your house and the way you live, built on a deep compacted base that rides out Wisconsin frost.See the details Ready for a yard you will use all year?
Call or text Wisconsin Outdoor Living, or send the form, and tell us about your yard. We reply with clear next steps and a plan that fits your home and your budget.
